Header
About this publication
Preface
Foreword
1 Scope and general
1.1 Scope
1.2 Application
1.3 Referenced documents
1.4 Definitions
1.5 Functional areas
1.6 Asset life cycle
1.7 Adoption of existing practices
1.8 Hazard identification and risk analysis
1.9 Communication
1.10 Handling of exceptions
2 Interface coordination
3 Design
3.1 General
3.2 Safeworking system selection
3.2.1 Safety level justification
3.2.2 Selection procedure
3.2.3 Factors to be considered
3.3 Operational integrity
3.3.1 Route integrity
3.3.2 Train integrity
3.3.3 Contingency planning
3.4 Construction sites
3.5 Safety of persons
3.5.1 General requirements
3.5.2 Factors to be considered
3.6 Verification and validation
4 Construction and implementation
4.1 General requirements
4.2 Factors to be considered
4.3 Verification and validation
5 Commissioning
5.1 General
5.2 Commissioning plan
6 Operations
6.1 General
6.2 Train management
6.3 Traffic management
7 Monitoring and maintenance
7.1 General
7.2 Inspection and maintenance
7.2.1 General
7.2.2 Factors to be considered
7.3 Monitoring operational performance
7.3.1 General
7.3.2 Factors to be considered
8 Modification
9 Decommissioning and disposal
Appendix A
Appendix B
Appendix C
C1 General
C2 Safety management requirements
C3 Types of track occupancy
C3.1 General
C3.2 Joint occupancy rules
C4 Transmission, execution and fulfilment of occupancy authorities
Appendix D
Appendix E
E1 General
E2 Electronic authority
E3 Centralized traffic control
E4 Automatic track section (block) signalling
E5 Electric staff
E6 Staff and ticket
E7 Train order working
Appendix F
F1 General
F2 Description and use
F2.1 Proceed authority (PA)
F2.2 Conditional proceed authority (CPA)
F2.3 Proceed restricted authority (PRA)
F2.4 Work authority (WA)
F2.5 Shunt authority (SHA)
F2.6 Authorities for track workers
F2.7 Local possession authority (LPA)
Appendix G
G1 General
G2 Issue of authorities
G3 Other track work arrangements