AS 4292.2-2006

Original price was: $79.00.Current price is: $39.00.

Railway safety management, Part 2: Track, civil and electrical infrastructure

File Format: PDF

Specifies technical requirements for track, civil and electrical infrastructure to be considered for inclusion in engineering and operating systems safety Standards forming part of a railway safety management system prepared in accordance with AS 4292.1.

Header

About this publication

Preface

Foreword

1 Scope and general

1.1 Scope

1.2 Application

1.3 Referenced documents

1.4 Definitions

1.5 Functional areas

1.6 Asset life cycle

1.7 Adoption of existing practices

1.8 Hazard identification and risk analysis

1.9 Communication

1.10 Handling of exceptions

2 Interface coordination

3 Design

3.1 General

3.2 Operating parameters

3.3 Infrastructure items

3.4 Verification and validation

4 Construction and implementation

4.1 General

4.2 Infrastructure requirements

4.3 Verification and validation

5 Commissioning

5.1 General

5.2 Inspection and test plan

6 Monitoring and maintenance

6.1 General

6.2 Monitoring and maintenance requirements

6.3 Temporary infrastructure restrictions

6.3.1 General requirements

6.3.2 Factors to be considered

7 Modification

8 Decommissioning and disposal

Appendix A

Appendix B

Appendix C

Appendix D

D1 General

D2 Sight distance provision

D2.1 Detailed recommendations

D2.2 Factors to be considered

D3 Operational signage

D3.1 Detailed recommendations

D3.2 Factors to be considered

D4 Structure and electrical infrastructure clearances

D4.1 Detailed recommendations

D4.2 Factors to be considered

D5 Track geometry

D5.1 Detailed design recommendations

D5.2 Detailed recommendations for actual geometry

D5.3 Factors to be considered

D6 Structures

D6.1 General

D6.2 Other party structures

D7 Flooding and storm damage management

D7.1 Detailed recommendations

D7.2 Factors to be considered

D8 Earthworks

D8.1 Detailed recommendations

D8.2 Factors to be considered

D9 Rail support systems

D9.1 Ballast

D9.1.1 Detailed recommendations

D9.1.2 Factors to be considered

D9.2 Sleepers, bearers and other rail support systems

D9.2.1 Detailed recommendations

D9.2.2 Factors to be considered

D9.3 Fastening assemblies

D9.3.1 Detailed recommendations

D9.3.2 Factors to be considered

D10 Rail

D10.1 Detailed recommendations

D10.2 Factors to be considered

D10.3 Welding of rail joints

D11 Guard rails

D12 Points and crossings

D12.1 Detailed recommendations

D12.2 Factors to be considered

D13 Track lateral stability

D13.1 Detailed recommendations

D13.2 Factors to be considered

D14 Access control and protection

D14.1 General

D14.2 Protection devices

D15 Fire prevention and control

D15.1 General recommendations

D15.2 Factors to be considered

D16 Operation and control of the electrical system

D17 Electric traction system capacity and integrity

D18 Separation distances from electrical equipment

D19 Working on live equipment

D20 Electrical switching and isolating procedures

D20.1 Detailed recommendations

D20.2 Factors to be considered

D21 Control of touch and step potentials

D21.1 Earthing

D21.2 Bonding and traction return systems

D22 Spatial location of conductors

D23 Electrical fault protection

D24 Electrolysis mitigation

D25 Electric traction system interference management

Appendix E

E1 Detailed recommendations

E2 Factors to be considered

Appendix F

F1 General

F2 Scheduled inspections

F3 Unscheduled inspection