Header
About this publication
Preface
Foreword
1 Scope and general
1.1 Scope
1.2 Application
1.3 Referenced documents
1.4 Definitions
1.5 Functional areas
1.6 Asset life cycle
1.7 Adoption of existing practices
1.8 Hazard identification and risk analysis
1.9 Communication
1.10 Handling of exceptions
2 Interface coordination
3 Design
3.1 General
3.2 Safeworking system selection
3.2.1 Safety level justification
3.2.2 Selection procedure
3.2.3 Factors to be considered
3.3 Signalling and telecommunications system requirements
3.3.1 General system requirements
3.3.1.1 System description
3.3.1.2 Specification
3.3.1.3 Factors to be considered
3.3.2 System configuration
3.4 Verification and validation
4 Construction and implementation
4.1 Detailed requirements
4.2 Factors to be considered
4.3 Verification and validation
5 Commissioning
5.1 General
5.2 Inspection and test plan
6 Monitoring and maintenance
6.1 General
6.2 Monitoring and maintenance requirements
6.3 Performance monitoring
7 Modification
8 Decommissioning and disposal
Appendix A
Appendix B